冲沟断层破碎带TBM隧洞地表预注浆加固效果研究  

Study on the effect of surface pre-grouting reinforcement for TBM tunnel in gully fault fracture zones

在线阅读下载全文

作  者:李庆楼 李元卓 裴成元 周振梁 Li Qinglou;Li Yuanzhuo;Pei Chengyuan(Key Laboratory for Urban Underground Engineeringof Ministry of Education,Bejing Jiaotong University,Bejing 100044,China;Xinjiang Shuifa Construction Group Co.,Ltd.,Urumqi 83000,China)

机构地区:[1]北京交通大学城市地下工程教育部重点实验室,北京100044 [2]新疆水发建设集团有限公司,新疆乌鲁木齐830000 [3]不详

出  处:《土木工程学报》2024年第S1期52-58,共7页China Civil Engineering Journal

基  金:中央高校基本科研业务费专项资金资助(2024JBMC046)。

摘  要:针对TBM穿越断层破碎带围岩破碎易卡机的问题,依托新疆某供水隧洞,通过现场试验、数值模拟和现场监测的方法系统对比分析了地表预注浆的加固效果。研究结果表明:TBM穿越断层破碎带发生塌方卡机的风险较大。地表预注浆加固增强了断层破碎带围岩的完整性与稳定性,降低了隧洞开挖引起的围岩收敛变形,变形降幅可达70.44%。地表预注浆加固措施改善了隧洞初期支护结构的受力特征,相较于未注浆情况锚杆轴力降低了89.91%,提高了初期支护结构的安全与稳定性。现场取芯结果、TBM掘进参数及现场监测数据的分析进一步证实,地表预注浆加固提高了岩体的强度和整体性,保障了TBM在复杂地质条件下的安全高效掘进。研究成果可为类似地质环境中TBM隧洞施工提供参考。To address the issue of TBM jamming due to fractured surrounding rock in fault fracture zones,a systematic comparison and analysis of the reinforcement effect of surface pre-grouting was conducted for a water supply tunnel in Xinjang.The study employed field tests,numerical simulations,and on-site monitoring.Results indicate a significant risk of collapse and TBM jamming when traversing fault fracture zones.Surface pre-grouting reinforcement was shown to enhance the integrity and stability of the surrounding rock in these zones,reducing the convergence deformation caused by tunnel excavation by up to 70.44%.Additionally,surface pre-grouting measures improved the stress characteristics of the initial support structure of the tunnel.In comparison to non-grouting conditions,the axial force of the anchor rods was reduced by 89.91%,thereby enhancing the safety and stability of the initial support structure.The analysis of core samples,TBM excavation parameters,and field monitoring data further confirms that surface pre-grouting reinforcement increases the strength and integrity of the rock mass,ensuring safe and efficient TBM tunneling under complex geological conditions.These research findings can serve as a reference for TBM tunnel construction in similar geological environments.

关 键 词:TBM隧洞 断层破碎带 地表预注浆 围岩变形 加固效果 

分 类 号:TU457[建筑科学—岩土工程]

 