检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:熊斌 XIONG Bin(Fujian Ningde Nuclear Power Co.,LTD.,Fujian Ningde 355200)
出 处:《中国质量》2025年第1期119-123,共5页China Quality
摘 要:核电站换料大修的质量控制状况直接影响下一个循环周期机组安全稳定运行,为提高检修质量可信度,电站投入专业质量保证人员,独立从事大修各阶段的大修质保监督工作。本文简述核电站大修质保监督工作运作方式,为大修质保工作标准化提供参考。The quality control status of nuclear power plant refuelling overhaul directly affects the safe and stable operation of the unit in the next cycle.In order to improve the reliability of the overhaul quality,the power station invests professional quality assurance personnel to independently engage in the overhaul quality assurance supervision at each stage.This paper briefly describes the operation mode of the overhaul quality assurance supervision of nuclear power plant,and provides reference for the standardization of the overhaul quality assurance work.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7