检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:笪良霞 谢炫蓉 王千姿 罗信天 Da Liangxia;Xie Xuanrong;Wang Qianzi;Luo Xintian(Zhejiang Industrial Design&Research Institute Co.,Ltd.,Hangzhou,Zhejiang 310052;Hangzhou Jiahe Mining Technology Co.,Ltd.,Hangzhou,Zhejiang 311215)
机构地区:[1]浙江省工业设计研究院有限公司,浙江杭州310052 [2]杭州佳合矿业技术有限公司,浙江杭州311215
出 处:《现代工程科技》2025年第2期49-52,共4页Modern Engineering Technology
摘 要:璜山金矿所在区域断裂构造发育,顶底板围岩条件较差,采矿损失率、贫化率较高,还存在诸多安全、环境问题。为此矿山采用充填法进行实践,基于矿山开采技术条件、现有充填系统、深部应力环境,设计采场的长度50 m、阶段高度30~40 m,标准矿块的综合回采率为93.5%,综合损失率6.5%,采矿贫化率控制在5%以内,取得了较好的实践效果。Huangshan gold mine is located in the area of fracture tectonic development,the top and bottom plate peripheral rock conditions are poor,mining loss rate,depletion rate is high,there are also many safety and environmental problems.For this reason,the mine adopts the filling method to practice,based on the technical conditions of mining,the existing filling system,the deep stress environment,the design of the length of the quarry 50 m,the design of the height of the stage is 30~40 m,the standard ore block of the integrated recovery rate of 93.5%,the integrated loss rate of 6.5%,the rate of mining depletion is controlled at 5%or less,and has achieved a better practical effect,and for similar mines to carry out the filling method mining practice and research has a certain reference significance.
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229