检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘沫羽[1] 白兴平[1] 张育瑞 黎静 李诚康 PAN Moyu;BAI Xingping;ZHANG Yurui;LI Jing;LI Chengkang(Northwest Engineering Corporation Limited,Xi'an Shaanxi 710065,China;College of Safety Science and Engineering,Xi'an University of Science and Technology,Xi'an Shaanxi 710054,China)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,陕西西安710065 [2]西安科技大学安全科学与工程学院,陕西西安710054
出 处:《安全》2025年第1期13-20,共8页Safety & Security
摘 要:为提高抽水蓄能电站斜(竖)井施工过程中的安全性、降低事故发生率,首先结合实际施工工序构建涵盖导井施工等7个施工阶段的安全风险评价指标体系;其次应用组合数有序加权算子和序关系法组合赋权,对各施工阶段中的关键指标进行赋值计算,得出各施工阶段指标的综合权重;最后应用集对分析法判定各指标的风险态势,并依据判断标准确定风险等级。结果表明:在斜(竖)井施工过程中,反井钻机安装后未调试、人员与爆破面安全距离不够、作业现场存在其他易燃易爆物品以及防坠措施不到位等属于高风险因素,这些因素所在的作业阶段为高风险作业阶段。针对高风险因素提出防控对策,可为斜(竖)井施工现场安全管理提供参考。To enhance safety during the construction of inclined(vertical)shafts in pumped storage power stations and mitigate the incidence of accidents,a comprehensive safety risk evaluation index system encompassing seven distinct construction stages,including pilot shaft construction,has been devised in combination with the actual construction procedures.Secondly,the combined weighting method of Combination Number-based Ordered Weighted Averaging(C-OWA)and Sequential Relation Analysis Method is applied to assign values and calculate the key indicators in each construction stage,thereby obtaining the comprehensive weights of the indicators in each construction stage.Finally,the set pair analysis method is employed to ascertain the risk status of each indicator and to determine the associated risk level in accordance with the established criteria.The findings indicate that during the construction of inclined(vertical)shafts,specific factors may contribute to an elevated risk of incident occurence.These include instances where the installation of the raise boring machine is not adequately debugged,there is an insufficient safe distance between personnel and the blasting face,there are other flammable and explosive items present at the job site,and there is an absence of adequate fall prevention measures.These factors may be particularly prevalent during specific operational stages,which could be considered high-risk.In response to these circumstances,a series of corresponding countermeasures have been proposed.This method has particular practical significance for enhancing the safety management level at the construction site where inclined(vertical)shafts are being built.
关 键 词:抽水蓄能电站 斜(竖)井施工 组合赋权 集对分析法 风险管控
分 类 号:X92[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.120