检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:晏波 陈卓[1] 郝正航[1] 熊国江 姚盼 YAN Bo;CHEN Zhuo;HAO Zhenghang;XIONG Guojiang;YAO Pan(College of Electrical Engineering,Guizhou University,Guiyang 550025,China)
出 处:《实验室研究与探索》2025年第1期69-73,共5页Research and Exploration In Laboratory
基 金:国家自然科学基金项目(52167007)。
摘 要:为了准确反映风电场群无功策略的控制性能,加速对风电场群自动电压控制(AVC)策略的验证,搭建了风电场群模型。根据风电场间输电线路距离对模型进行分割,并建立各子风电场模型之间、子风电场与AVC硬件之间的通信,监测各控制节点实时电压。最后,基于由UREP300实时仿真器搭建的风电场群AVC硬件在环(HIL)试验平台验证了风电场群AVC策略的可行性。To accurately reflect the control performance of the reactive power strategy in a wind farm cluster and accelerate the development and verification of the automatic voltage control(AVC)strategy for the wind farm cluster,a wind farm cluster model was established.The transmission line distances between the wind farms were segmented,and communication was enabled between the models of each sub-wind farm and between the sub-wind farms and their AVC hardware to monitor the real-time voltage at each control node by the AVC device.A hardware-in-loop(HIL)testing platform for the AVC of the wind farm cluster was built based on the UREP300 real-time simulation system.This platform was used to verify the AVC control strategy of a specific wind farm cluster.The simulation and experimental results demonstrate the feasibility of the AVC strategy for the wind farm cluster.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.170.100