检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张哲 Zhang Zhe(The Third Engineering Company of China Railway Construction Electrfiication Bureau Group,Gaobeidian,Hebei,China,074000)
机构地区:[1]中铁建电气化局集团第三工程有限公司,河北高碑店074000
出 处:《仪器仪表用户》2025年第1期102-104,共3页Instrumentation
摘 要:文中针对高寒地区高速铁路电力系统面临的电源规划设计、施工、运行及应急处置的挑战进行了深入研究,提出了切实可行的关键技术解决方案。通过跨所供电技术的应用有效解决了电源引入滞后问题以及农网频繁故障问题。介绍了在线测温设备与高寒高铁电力远动系统短信遥控重启装置的开发与应用。结果表明,这些技术的应用显著提高了系统的稳定性和可靠性,确保了高寒区域高速铁路设备的持续供电。This article conducts a thorough study on the challenges faced by the power system of high-speed railways in alpine regions during power supply planning,design,construction,operation,and emergency response.Practical and feasible key technical solutions are proposed.The application of cross-substation power supply technology effectively addresses the issues of delayed power supply introduction and frequent failures in rural power grids.The development and application of online temperature measurement equipment and the SMS remote control restart device for the power telecontrol system of high-speed railways in alpine regions are introduced.The results show that the application of these technologies significantly improves the stability and reliability of the system,ensuring continuous power supply for high-speed railway equipment in alpine regions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.147.211