水文测验在内河库区航道测量项目中应用探讨  

Discussion on the application of hydrology test in hydrographic survey project of inland river reservoir area

作  者:薛武申 邓华贵 刘颖 Xue Wushen;Deng Huagui;Liu Ying(Guangxi Beigang Planning and Design Institute Co.,Ltd.,Nanning Guangxi 530300,China)

机构地区:[1]广西北港规划设计院有限公司,广西南宁530300

出  处:《港口航道与近海工程》2025年第1期102-107,共6页Port,Waterway and Offshore Engineering

摘  要:水文测验是水文学研究的基础,也是水资源管理、工程建设和防灾减灾等领域的关键技术支持。通过结合航道测量及水位分析(融江河段及柳江、红水河部分河段)项目水文测验工作实施要求,重点对水文测验过程中的准备工作、ADCP安装调试和各项工作具体实施进行阐述,系统总结瞬时水位测量和断面流量测量在内河库区航道实际工作中积累的经验,期望对水文测验工作者在类似工程项目提供有益参考。Hydrology test is the foundation of hydrology research,and it is also the key technical support for water resources management,engineering construction,disaster prevention and reduction.Based on hydrographic survey and water level analysis(Rongjiang River reach,Liujiang River,Hongshui River)project hydrographic test implementation requirements,focusing on the hydrographic test process preparation,ADCP installation and commissioning and specific implementation of various work,systematically summarized the instantaneous water level measurement and section flow measurement in the waterway of inland river reservoir area accumulated experience.It is expected to provide useful reference for hydrographers in similar projects.

关 键 词:水文测验 走航式ADCP 断面流量测量 水位测量 内河库区航道 

分 类 号:U617.6[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象