复杂地质下定向钻穿越管道防腐及施工优化应用  

Anti-corrosion prevention and construction optimization application of directional drilling through pipeline under complex geology

在线阅读下载全文

作  者:郭军龙 GUO junlong(Shandong Electric Power Engineering Consulting Institute Co.,Ltd.,Jinan 250013,China)

机构地区:[1]山东电力工程咨询院有限公司,山东东济南250013

出  处:《中国高新科技》2024年第24期150-151,154,共3页

摘  要:廉江核电项目九洲江引水工程共有7处过河段,河道地质条件复杂,在水平定向钻穿越施工过程中通过对管道防腐层及防护层设计、扩孔、修孔、清孔、回拖等各个施工工序的优化,经2次试回拖,验证了设计、施工优化的效果,后续管道穿越施工非常成功。Lianjiang Jiuzhou River water diversion project nuclear power project a total of seven river,river geological conditions,through the horizontal directional drilling through the pipeline corrosion layer,protective layer design,expansion,hole,hole,back to the optimization of the construction process,after the second test back to drag,verified the design,construction optimization effect,subsequent pipeline through the construction is very successful.

关 键 词:定向钻 防腐 防护 扩孔 修孔 清孔 回拖 

分 类 号:TE988[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象