某高速公路钢箱梁桥定额测定研究  

Study of Quota Determination for Steel Box Girder Bridge of an Expressway

在线阅读下载全文

作  者:张永强 李文英 ZHANG Yong-qiang;LI Wen-ying(Shanxi Province Communications Planning Surveying and Designing Institute Co.Ltd.,Taiyuan 030032,China;CCCC First Highway Consultants Co.Ltd.,Xi'an 710075,China)

机构地区:[1]山西省交通规划勘察设计院有限公司,太原市030032 [2]中交第一公路勘察设计研究院有限公司,西安市710075

出  处:《公路》2025年第1期228-232,共5页Highway

摘  要:为了提高高速公路的造价控制水平,首先分析了工程定额测定的意义、基本原则及依据,随后分析了写实记录法、测时法、施工实测法、比较类推法等在定额测定中的具体应用,并从准备阶段、实施阶段、验证阶段三方面阐述了定额测定流程。最后,以宝岩河大桥为研究对象,将测定消耗量与定额消耗量进行对比,求出了定额测定误差,研究成果可为类似项目的定额测定提供理论指导。In order to improve the cost control level of expressway,the significance,basic principles and basis of engineering quota determination are analyzed firstly in the paper,then the specific application of realistic recording method,time measurement method,construction measurement method and comparative analogy method in quota determination are analyzed,and the quota determination process is expounded from preparation stage,implementation stage and verification stage.Finally,taking the Baoyan River Bridge as the research object,the measured consumption is compared with the quota consumption,and the quota measurement error is obtained.The research results can provide theoretical guidance for the quota measurement of similar projects.

关 键 词:高速公路 钢箱梁桥 预算定额 测定方法 工程案例 测定结果 

分 类 号:U445.2[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象