不同工况下施工顺序对装配式结构梁桥应力影响分析  

Analysis of the influence of construction sequence on the stress of prefabricated structural beam bridges under different working conditions

在线阅读下载全文

作  者:周路瑶 张志新 ZHOU Luyao;ZHANG Zhixin(Zhongzi Huake Transportation Construction Technology Co.,Ltd.,Beijing 100195 China)

机构地区:[1]中咨华科交通建设技术有限公司,北京100195

出  处:《山东交通科技》2024年第6期87-89,共3页

摘  要:装配式结构的预应力混凝土先简支后结构连续桥梁的施工顺序多样,以4×20 m跨径的装配式预应力混凝土箱梁为例,利用midas Civil分析不同工况下施工顺序对主梁应力影响,并讨论出合理的施工顺序,指导施工作业。The construction sequence of prefabricated prestressed concrete bridge with simple support and continuous structure is diverse.Taking a 4×20 m span prefabricated prestressed concrete box beam as an example,midas Civil is used to analyze the impact of construction sequence on the stress of the main beam under different working conditions,and to discuss a reasonable construction sequence to guide construction operations.

关 键 词:装配式梁桥 工况 施工顺序 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象