作 者:杨俊文 YANG Junwen(Sanyuan Nanyao Xiaochang Coal Industry Co.,Ltd.in Suburbs of Changzhi City,Shanxi Province,Changzhi 046000,Shanxi,China)
机构地区:[1]山西长治郊区三元南耀小常煤业有限公司,山西长治046000
出 处:《能源与节能》2025年第2期271-275,共5页Energy and Energy Conservation
摘 要:小常煤业302轨道上山属于典型的大断面准备煤巷,为实现其快速掘进及长期稳定,通过数值模拟、应用实践等方法,开展大断面煤巷快速掘进及锚网索支护参数优化研究。研究表明,掘锚一体机截割部采用正S形截割方式对围岩稳定性影响最小。确定了最合理的锚杆、锚索长度及间排距等参数,基于此确定302轨道上山掘进机支护方案,实施后巷道表面变形量在工程设计允许范围内,稳定性较好,且将巷道掘进效率较原支护参数下提升了20%,取得了可观的综合效益。The 302 upward sloping roadway of Xiaochang Coal Industry Co.,Ltd.is a typical large section prepared coal roadway.In order to achieve rapid excavation and long-term stability,numerical simulation,application practice and other methods were used to carry out research on rapid excavation of large section coal roadway and optimization of anchor net and cable support parameters.The research shows that the use of a regular S-shaped cutting method in the cutting section of the integrated tunneling and anchoring machine has the least impact on the stability of the surrounding rock.The most reasonable parameters such as anchor rod,anchor cable length,and spacing were determined,and based on this,the excavation machine support scheme for the 302 upward sloping roadway was determined.After implementation,the deformation of the tunnel surface was within the allowable range of the engineering design,and the stability was good.Moreover,the tunnel excavation efficiency was improved by 20% compared to the original support parameters,achieving considerable comprehensive benefits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.77.105