晋钢炼铁厂降本增效攻关实践  

Practice of Cost Reduction and Efficiency Improvement in Jingang Iron-making Plant

在线阅读下载全文

作  者:丁继师 Ding Jishi(Shanxi Jincheng Steel Holding Group Co.,Ltd.,Zezhou Shanxi 048002,China)

机构地区:[1]山西晋城钢铁控股集团有限公司,山西泽州048002

出  处:《山西冶金》2024年第11期160-162,共3页Shanxi Metallurgy

摘  要:晋钢炼铁厂受原燃料结构变化和有害元素负荷升高影响,存在整体炉况稳定性较差、压量不适等问题,对此,于2023年9—12月实施铁前一体化、完善燃料评价、优化原燃料结构、改进操作制度、开展煤比攻关等措施,使得炉况稳定性大幅度提升,焦炭负荷由4.6~4.7 t/t提高至4.90 t/t以上,焦比由380 kg/t以上降到350 kg/t以下,煤比由150 kg/t提高到170 kg/t以上,降本增效成绩显著。Due to changes in the structure of raw materials and the increase in harmful element loads,Jingang iron-making plant has problems such as poor overall furnace stability and inappropriate pressure.To address these issues,measures will be implemented from September to December 2023,including the integration of pre iron,improvement of fuel evaluation,optimization of raw material and fuel structure,improvement of operating systems,and coal ratio research.These measures have significantly improved furnace stability,increased coke load from 4.6~4.7 t/t to over 4.90 t/t,reduced coke ratio from above 380 kg/t to below 350 kg/t,and increased coal ratio from 150 kg/t to over 170 kg/t,resulting in significant cost reduction and efficiency improvement.

关 键 词:炼铁厂 提煤降焦 操作制度 攻关 

分 类 号:TF58[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象