检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林志超 Lin Zhichao(Fujian Quanzhou Minguang Steel Co.,Ltd.,Quanzhou Fujian 362441,China)
机构地区:[1]福建泉州闽光钢铁有限责任公司,福建泉州362411
出 处:《山西冶金》2024年第12期171-174,179,共5页Shanxi Metallurgy
摘 要:针对福建泉州闽光钢铁有限责任公司轧钢厂棒材生产线在切分轧制轧间控冷工艺生产过程中存在控冷后道次设备故障率高、通条负偏差偏差大的问题,分析问题产生原因,并提出优化改进措施。通过对轧间控冷工艺进行优化及应用,使得控冷后道次设备故障率明显降低,通条负偏差偏差大的问题得到有效改善。In response to the problems of high equipment failure rate and large negative deviation deviation in the controlled cooling process of the bar production line of Minguang Iron and Steel Co.,Ltd.during the cutting and rolling of the bar production line,this article analyzes the causes of the problems and proposes optimization and improvement measures.By optimizing and applying the controlled cooling process in the rolling mill,the failure rate of the pass equipment after controlled cooling has been significantly reduced,and the problem of large negative deviation deviation in the entire strip has been effectively improved.
分 类 号:TG335.6[金属学及工艺—金属压力加工]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.179.147