检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶超峰 Ye Chaofeng(Research Institute for Environmental Innovation
机构地区:[1]清华苏州环境创新研究院,江苏苏州215163
出 处:《山西冶金》2024年第12期199-201,共3页Shanxi Metallurgy
摘 要:某企业高炉富氧喷煤需氧量严重不足,为满足高炉富氧炼铁,进行氧喷吹改造,新建1座空分设备,制氧能力为16600 m^(3)/h。项目改造后高炉富氧率由2.24%提升至3.75%,单位炼铁能源消耗由408.75 kgce/t降低至397.08 kgce/t,较改造前降低2.85%。基于改造前后完整年运行数据,按照节能量计算方法归一化分析计算,高炉富氧喷吹节能改造每年可产生节能量35995 tce,达到了节能效果。The oxygen demand of oxygen-rich coal injection in the blast furnace of the enterprise is seriously insufficient.In order to meet the requirements of oxygen-rich iron making,oxygen spraying transformation is conducted,and an air separation equipment is built with an oxygen production capacity of 16600 Nm^(3)/h.After the transformation of the project,the oxygen rich rate of blast furnace increased from 2.24%to 3.75%,and the energy consumption per unit of iron making was reduced from 408.75 kgce/t to 397.08 kgce/t,2.85%lower than that before the transformation.Based on the complete annual operation data before and after the transformation,according to the normalized analysis and calculation of the energy saving calculation method,the energy saving transformation of oxygen-rich injection of blast furnace can produce energy saving of 35995 tons of standard coal every year,which achieves the effect of energy saving and carbon reduction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.212.19