检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孔令峰 KONG Lingfeng(SEPCOⅢ Electric Power Construction Co.,Ltd.,Qingdao 266100,Shandong,China)
机构地区:[1]山东电力建设第三工程有限公司,山东青岛266100
出 处:《工程技术研究》2024年第21期100-102,共3页Engineering and Technological Research
摘 要:文章基于电厂汽轮机的基本结构,阐述电厂汽轮机的主要安装内容,分析电厂汽轮机安装常见问题,随后提出电厂汽轮机安装质量保障策略,旨在通过更完善的安装调试方案,提高电厂汽轮机的安装质量,使其整体性符合电厂安全运行的基本要求,为我国高效利用电力资源奠定基础。Based on the basic structure of steam turbine in power plant,this paper expounds the main installation contents of steam turbine in power plant,analyzes the common problems of steam turbine installation in power plant,and then puts forward the quality assurance strategy of steam turbine installation in power plant,aiming at improving the installation quality of steam turbine in power plant through more perfect installation and debugging scheme,so as to make its integrity meet the basic requirements of safe operation of power plant,and lay a foundation for the efficient utilization of power resources in China.
分 类 号:TM62[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.228