2106综放工作面切顶卸压技术对停采线位置的影响  

Influence of Roof Cutting and Pressure Relief Technology on Stop Mining Line Position in 2106 Fully Mechanized Caving Face

作  者:郝池胜 HAO Chisheng(Wangzhuang Coal Mine,Lu'an Chemical Group,Changzhi 046031,China)

机构地区:[1]潞安化工集团王庄煤矿,山西长治046031

出  处:《煤炭技术》2025年第2期31-35,共5页Coal Technology

摘  要:为减少综放工作面停采线保护煤柱留设宽度,提高资源回收率,以某矿2106综放工作面为研究背景,采用理论分析、数值模拟、工程试验等方法,对2106综放工作面停采线位置进行了分析研究。研究结果表明,采用水力压裂切顶卸压技术后,可以将末采保护煤柱宽度由70 m减小为50 m,保护了采区准备巷道的稳定性,提高了煤炭资源的采出率,具有显著的经济效益与社会效益。In order to reduce the width of the protective coal pillar for the stop mining line in the fully mechanized top coal caving face and improve resource recovery rate,taking the 2106 fully mechanized top coal caving face in a certain mine as the research background,theoretical analysis,numerical simulation,engineering experiments and other methods were used to analyze and study the position of the stop mining line in the 2106 fully mechanized top coal caving face.The research results indicate that the use of hydraulic fracturing top cutting and pressure relief technology can reduce the width of the final mining protection coal pillar from 70 m to 50 m,protect the stability of the preparation roadway in the mining area,improve the extraction rate of coal resources,and have significant economic and social benefits.

关 键 词:综放工作面 数值模拟 停采线 切顶卸压 

分 类 号:TD323[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象