西藏某水电站吊桥与吊运线施工技术探讨  

Discussion on Construction Techniques for Suspension Bridges and Lifting Lines in Hydropower Stations in Tibet

在线阅读下载全文

作  者:贾孟飞 鲁振东 Jia Meng-fei;Lu Zhen-dong(Northwest Hydropower Engineering Co.,Ltd.,Xi'an 710100,Shaanxi Province,China)

机构地区:[1]西北水利水电工程有限责任公司,陕西西安710100

出  处:《建筑与装饰》2025年第3期118-120,共3页Construction & Decoration

摘  要:本文详细探讨了西藏某地区进行预可研、可研勘探阶段所需的临时吊桥与吊运线施工技术。首先概述了工程的背景、目的及地理环境特征。接着,深入讨论了吊桥和吊运线的施工技术,涉及施工准备、主要施工步骤及安全管理与质量控制措施。特别在施工技术方面,细致介绍了吊索安装、载具及运行系统安装,以及调试与验收的关键环节。这些技术和方法对于确保临时结构的安全性、稳定性和有效性至关重要。This paper provides a detailed discussion on the construction techniques required for temporary suspension bridges and lifting lines during the pre-feasibility and feasibility exploration stages in a certain area of Tibet.It first outlines the background,purpose,and geographical environmental characteristics of the project.Then,it delves into the construction techniques for suspension bridges and lifting lines,covering construction preparation,main construction steps,and safety management and quality control measures.Particularly in terms of construction techniques,it introduces in detail the key aspects of suspension cable installation,load-bearing device and operating system installation,as well as commissioning and acceptance.These techniques and methods are crucial for ensuring the safety,stability,and effectiveness of temporary structures.

关 键 词:吊桥施工技术 吊运线 施工技术 

分 类 号:U44[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象