Formation condition for concave-bank deposition in the meanders of the Middle Yangtze River and its application  

在线阅读下载全文

作  者:Xin Liu Junqiang Xia Shanshan Deng Meirong Zhou Koen Blanckaert 

机构地区:[1]State Key Laboratory of Water Resources Engineering and Management,Wuhan University,Wuhan,430072 [2]China Bureau of Hydrology,Changjiang Water Resources Commission,Wuhan,430010 [3]China Institute of Hydraulic Engineering and Water Resources Management,Research Unit Hydraulic Engineering and Environmental Hydromechanics,Technische Universität Wien(TU Wien),Vienna,1300,Austria

出  处:《International Journal of Sediment Research》2024年第6期903-915,共13页国际泥沙研究(英文版)

基  金:National Natural Science Foundation of China(Grant Nos.U2040215,U2240206,and 52379079).

摘  要:In what kind of meanders concave-bank deposition(CBD)can occur remains an open question.This study investigated the characteristics and major influencing factors of CBD in the meanders of the Middle Yangtze River(MYR),and proposed a formation condition for CBD.Concave-bank deposition occurred in 10 of 23 meanders in the MYR,including two types:counter point bar(CPB)and concave-bank bench(CBB).CPB occurred in both mildly-curved and sharp bends,while CBB only occurred in sharp bends.Hydrodynamic conditions and sediment supply are two major factors controlling the formation of CBD.The incoming sediment load remained in an amount of 0.68×10^(8) t/y at Jianli and 0.77×10^(8) t/y at Luoshan after Three Gorges Project operation,therefore,CBD development was not limited by a lack of sediment and instead is mainly dependent on the hydrodynamic conditions in the MYR.Flow separation zones were observed in the typical CBD-type bends of the MYR,which indicated that CBD was the result of flow separation or recirculation.An adverse longitudinal water surface gradient is the necessary condition for the formation of concave-bank flow separation.Therefore,a formation condition for CBD was proposed based on this assumption,which considered the combined effects of channel resistance,riverbed slope,channel widening,and curvature.CBD happens when the channel widening and cur-vature terms are greater than the channel resistance and longitudinal channel slope terms.The proposed condition was verified based on the data of the 23 bends in the MYR and 26 bends in 12 other rivers.The results indicated that more than 85%of the bends were correctly identified.Therefore,the proposed formation condition provided considerably high accuracy.

关 键 词:Formation condition Counter point bar Concave-bank bench Flow separation Middle Yangtze River 

分 类 号:F29[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象