检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张慧博 郭浩飞 王伯安 ZHANG Hui-bo;GUO Hao-fei;WANG Bo-an(China Railway Shanhaiguan Bridge Group Co.,Ltd.,Qinhuangdao 066000,China)
出 处:《价值工程》2025年第5期64-66,共3页Value Engineering
摘 要:为准确研判高速扩建钢桥施工过程中的各因素危险性,提出一种基于改进CUOWGA算子赋权评估方法。首先,通过文献研究,引入WSR方法,从事理、物理、人理等3个方面构建了高速扩建钢桥施工风险体系;引入模糊语义量化算子和规范化决策矩阵优化CUOWGA算子运算过程,以降低指标主观性,实现高速扩建钢桥施工风险指标赋权。研究结果表明,人理因素是影响施工安全的主要层面。In order to accurately assess the hazards of various factors during the construction process of high-speed expansion steel bridges,a weighted evaluation method based on an improved CUOWGA operator is proposed.Firstly,through literature research,the WSR method was introduced to construct a risk system for the construction of high-speed expansion steel bridges from three aspects:rational,physical,and human factors.The fuzzy semantic quantization operator and normalized decision matrix are introduced to optimize the CUOWGA operator operation process,in order to reduce the subjectivity of indicators and achieve the weighting of risk indicators for high-speed expansion steel bridge construction.The research results indicate that human factors are the main aspect affecting construction safety.
关 键 词:危险性研判 WSR方法 改进CUOWGA算子
分 类 号:U445.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188