小龙潭露天矿坑底排水系统淤泥闷泵的形成原因及治理  

Formation cause and treatment of silt pump blockage in the bottom drainage system of Xiaolongtan Open-pit Mine

在线阅读下载全文

作  者:李朝泽 LI Chaoze(Yunnan Xiaolongtan Mining Bureau Co.,Ltd.,Kaiyuan 661699,China)

机构地区:[1]云南小龙潭矿务局有限责任公司,云南开远661699

出  处:《露天采矿技术》2025年第1期57-61,共5页Opencast Mining Technology

摘  要:以小龙潭露天矿坑底排水系统930 m水平水仓潜水排水电泵闷泵问题为研究对象,基于煤层底板水的赋存状态、地表水径流、泥沙汇流、水力联系、涌水规律、突涌性情况,结合水文地质资料和历史数据,通过监测统计和科学计算对比分析,明确了大气降雨伴随泥沙汇流是导致淤泥闷泵形成的主要因素,同时探讨分析了几种治理措施。Taking 930 m level water tank submersible drainage electric pump blockage problem in Xiaolongtan Open-pit Mine pit bottom drainage system as the research object,based on the occurrence status of coal seam floor water,surface water runoff,sediment concentration,hydraulic connection,water inrush law and sudden surge situation,combined with hydrogeological data and historical data,through monitoring statistics and scientific calculation comparative analysis,the article clarifies atmospheric rainfall accompanied by sediment convergence is the main factor leading to the formation of silt blockage pumps,discusses and analyzes several treatment measures.

关 键 词:煤矿防治水 排水潜水电泵 淤泥闷泵 水质分析 治理措施 

分 类 号:TD744[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象