面板堆石坝翻模固坡施工消耗量实测分析研究  

Measurement and Analysis of Construction Consumption of Turnover Formwork for Slope Stabilization of Concrete Face Rockfill Dam

在线阅读下载全文

作  者:孙爱梅 卢斌[2] 赵晓宇 SUN Aimei;LU Bin;ZHAO Xiaoyu(Shandong Yimeng Pumped Storage Co.,Ltd,Linyi 273400,China;Nanjing Hydraulic Research Institute,Nanjing 210029,China;Shandong Taishan Pumped Storage Co.,Ltd,Taian 271000,China)

机构地区:[1]山东沂蒙抽水蓄能有限公司,山东临沂273400 [2]南京水利科学研究院,江苏南京210029 [3]山东泰山抽水蓄能有限公司,山东泰安271000

出  处:《建筑经济》2024年第S2期237-241,共5页Construction Economy

摘  要:翻模固坡技术由于具有安全性高、坡面平整度好、施工干扰少、大坝随时具备挡水度汛条件等优点,近年来被广泛应用到抽水蓄能电站等堆石坝工程建设中,而水电工程现行定额标准无相关翻模固坡定额。通过实测某抽水蓄能电站大坝翻模固坡各工序人材机消耗量,对测定数据进行统计分析,形成施工定额消耗量,为建设单位、施工单位等项目参建各方进行造价管理等提供参考依据。Tilting mold slope reinforcement technology has been widely used in the construction of rock fill dam projects such as pumped storage power stations in recent years because of its advantages of high safety,good slope flatness,less construction interference,and dam can hold water at any time.However,there is no relevant tilting mold slope reinforcement norm for hydropower projects.By measuring the consumption of manpower machine in each process of a pumped storage power station,the measured data are statistically analyzed to form the construction quota consumption,which provides a reference for construction units,construction units and other project participants to carry out cost management.

关 键 词:翻模固坡 消耗量 基本直接费 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象