摘 要:湿陷性黄土地区因地质结构不稳定,常面临地基沉降、变形和开裂等问题,会降低建筑物的支撑力,迫切需要采取有效的地基强化措施进行控制。文章探讨湿陷性黄土沉降机理及加固方法,分析挤密桩的施工工艺、操作流程及工艺参数,确定挤密桩桩长为6 m,桩径为0.4 m。结果表明,使用挤密桩后,地基沉降明显降低,相较于未采用挤密桩的地基沉降值分别降低了35.1%、45.2%与32.9%。Due to the instability of geological structure in collapsible loess area,it is often faced with the problems of foundation settlement,deformation and cracking,which will reduce the support force of buildings.Therefore,it is urgent to take effective foundation strengthening measures for control.This paper discusses the settlement mechanism and reinforcement method of collapsible loess,analyzes the construction process,operation process and process parameters of compaction pile,and determines that the length of compaction pile is 6 m and the diameter of the pile is 0.4 m.The results show that the foundation settlement is signifi cantly reduced after using compaction piles,and the settlement values of the foundation are reduced by 35.1%,45.2%and 32.9%respectively compared with that of the one without using compaction piles.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.100.3