检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨伟东 YANG Weidong(Jinan Rail Transit Group Construction Investment Co.,Ltd.,Jinan 250000,Shandong,China)
机构地区:[1]济南轨道交通集团建设投资有限公司,山东济南250000
出 处:《工程技术研究》2024年第23期68-71,共4页Engineering and Technological Research
摘 要:文章依托济南轨道交通4号线省体育中心站—泉城公园站区间实际工程,系统性地探讨了盾构机的吊装流程,进行了安全性验算,包括地基承载力分析、吊机性能评估及吊耳受力计算等多个方面。通过严谨的计算和详细的分析,以期为类似项目的盾构机吊装施工提供技术支持和实践经验,确保施工顺利进行。This paper systematically discusses the lifting process of shield machine and carries out safety checking calculation based on the actual engineering of the interval from Provincial Sports Center Station to Quancheng Park Station on Jinan Rail Transit Line 4,including foundation bearing capacity analysis,crane performance evaluation and lifting lug force calculation.Through rigorous calculation and detailed analysis,it is expected to provide technical support and practice experience for the lifting construction of shield machine in similar projects,so as to ensure the smooth construction.
分 类 号:U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171