主汛期水库实时调度策略及风险评估方法探讨  

Discussion on Real-time Scheduling Strategy and Risk Assessment Method for Reservoirs During the Main Flood Season

在线阅读下载全文

作  者:张水明 ZHANG Shuiming(Sichuan Huadian XixiRiver Hydroelectric Development Co.,Ltd.,Xichang Sichuan 615050)

机构地区:[1]四川华电西溪河水电开发有限公司,四川西昌615050

出  处:《中国科技纵横》2024年第24期32-34,共3页China Science & Technology Overview

摘  要:随着计算技术的进步和数据采集技术的发展,利用现代信息技术辅助水库调度变得越来越重要。通过构建基于实时数据的动态调度模型,结合先进的优化算法,可以更精确模拟水库在不同降水和入流条件下的性能,制定科学合理的调度策略。本文探讨了主汛期水库的实时调度策略及风险评估方法,通过构建优化模型和算法,提高水库调度的效率和精确度,评估和管理调度过程中面临的风险。With the advancement of computing technology and the development of data collection technology,utilizing modern information technology to assist reservoir scheduling has become increasingly important.By constructing a dynamic scheduling model based on real-time data and combining advanced optimization algorithms,the performance of reservoirs under different precipitation and inflow conditions can be more accurately simulated,and more scientific and reasonable scheduling strategies can be formulated.This article explores the real-time scheduling strategy and risk assessment method of reservoirs during the main flood season,by constructing optimization models and algorithms,improve the efficiency and accuracy of reservoir scheduling,simultaneously evaluate and manage the risks faced during the scheduling process.

关 键 词:主汛期 水库 实时调度 风险评估 

分 类 号:TV697.13[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象