水库土石坝工程坝型变更选择设计实例  

Design Example of Dam Type Change Selection for Reservoir Earth Rock Dam Engineering

在线阅读下载全文

作  者:金诚 JIN Cheng(Huaneng Lancang River Hydropower Inc.,Kunming 650000,China)

机构地区:[1]华能澜沧江水电股份有限公司,云南昆明650000

出  处:《云南水力发电》2025年第2期70-73,共4页Yunnan Water Power

摘  要:大坝是水利工程和水电工程中的重要建筑物,大坝安全性异常重要,大坝投资占据工程大部分投资,大坝坝型的选择必须高度重视、综合比选、充分论证。文章针对一小一型水库的坝型,在实施中的变更选择,变更实施完成,工程进展顺利。Dams are important structures in water conservancy and hydropower engineering,and their safety is extremely important.Dam investment accounts for the majority of project investment,and the selection of dam types must be highly valued,comprehensively compared,and fully demonstrated.The article focuses on the selection of changes in the dam type of a small reservoir during implementation.The implementation of the changes has been completed and the project is progressing smoothly.

关 键 词:坝型选择 坝型设计 水库坝型 土石坝 

分 类 号:TV222[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象