阿合塔斯水库施工条件及施工导流方案分析  

Analysis of Construction Conditions and Diversion Plan for Ahetas Reservoir

在线阅读下载全文

作  者:苏娟 SU Juan(Gansu Water Resources and Hydropower Engineering Bureau Co.,LTD.,Lanzhou 730000,China)

机构地区:[1]甘肃省水利水电工程局有限责任公司,甘肃兰州730000

出  处:《云南水力发电》2025年第2期118-120,共3页Yunnan Water Power

基  金:国家自然科学基金项目(520668044)。

摘  要:阿合塔斯水库的兴建,对解决强罕河灌区灌溉季节工程性缺水问题具有重要的意义。文章在研究工程区水文气象、工程地质、施工交通、供电、供水等施工条件的基础上,进一步对工程施工导流方案进行探讨,包括导流方式、导流建筑物施工、截流施工以及基坑排水等,对保证水库顺利施工具有重要的指导意义。The construction of Ahetas Reservoir is of great significance in solving the seasonal engineering water shortage problem in Qianghan River irrigation area.On the basis of studying the construction conditions such as hydro meteorology,engineering geology,construction transportation,power supply,and water supply in the engineering area,this article further explores the construction diversion scheme,including diversion methods,diversion building construction,interception construction,and foundation pit drainage,which has important guiding significance for ensuring the smooth construction of the reservoir.

关 键 词:阿合塔斯水库 施工条件 导流方式 围堰 导流洞 

分 类 号:TV52[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象