超高拱坝的电梯井结构静力计算研究  

Static Calculation Research on Elevator Shaft Structure of Ultra-high Arch Dam

在线阅读下载全文

作  者:陶俊佳 TAO Junjia(Power China Huadong Engineering Corporation Limited,Hangzhou 311122,China)

机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州311122

出  处:《云南水力发电》2025年第2期150-153,共4页Yunnan Water Power

摘  要:对白鹤滩水电站超高拱坝的带电梯井结构的拱坝坝段采用线弹性有限元法进行计算。采用子模型法,先对大坝整体模型进行计算,得到接触面上的节点位移,再取电梯井坝段建立精细化子模型进行计算,并对井壁结构按照应力图形法进行配筋计算分析,并结合类似工程确定配筋方案,为工程施工图设计提供依据。Linear elastic finite element method is used to calculate the arch dam section of the electric ladder well structure of the ultra-high arch dam of Baihetan Hydropower Station.By using sub model method,this paper first calculates the overall model of the dam,obtains the node displacement on the contact surface,and then establishes a refined sub model for the elevator shaft dam section for calculation.The reinforcement calculation and analysis of the wellbore structure are carried out according to the stress graph method.Finally,it combines similar projects to determine the reinforcement scheme,providing a basis for the design of construction drawings.

关 键 词:拱坝 电梯井 应力 配筋 

分 类 号:TV314[水利工程—水工结构工程] TV642.4

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象