检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陶俊佳 TAO Junjia(Power China Huadong Engineering Corporation Limited,Hangzhou 311122,China)
机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州311122
出 处:《云南水力发电》2025年第2期150-153,共4页Yunnan Water Power
摘 要:对白鹤滩水电站超高拱坝的带电梯井结构的拱坝坝段采用线弹性有限元法进行计算。采用子模型法,先对大坝整体模型进行计算,得到接触面上的节点位移,再取电梯井坝段建立精细化子模型进行计算,并对井壁结构按照应力图形法进行配筋计算分析,并结合类似工程确定配筋方案,为工程施工图设计提供依据。Linear elastic finite element method is used to calculate the arch dam section of the electric ladder well structure of the ultra-high arch dam of Baihetan Hydropower Station.By using sub model method,this paper first calculates the overall model of the dam,obtains the node displacement on the contact surface,and then establishes a refined sub model for the elevator shaft dam section for calculation.The reinforcement calculation and analysis of the wellbore structure are carried out according to the stress graph method.Finally,it combines similar projects to determine the reinforcement scheme,providing a basis for the design of construction drawings.
分 类 号:TV314[水利工程—水工结构工程] TV642.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28