盾构机过地铁车站施工技术与管理对策研究  

Research on the Construction Technology and Management Countermeasures of Shield Tunneling Machine in Subway Station

在线阅读下载全文

作  者:肖承彪 XIAO Chengbiao(Municipal Construction Company,China Railway 17th Bureau Group,Wuxi 214000,Jiangsu,China)

机构地区:[1]中铁十七局集团市政建设公司,江苏无锡214000

出  处:《流体测量与控制》2025年第1期85-87,95,共4页Fluid Measurement & Control

摘  要:随着城市化进程的加快,城市基础建设水平日益提升,很多城市加大了地铁工程的建设力度。在地铁开挖作业中对盾构机设备进行优化应用,能够进一步提高地铁站建设的效率,同时可减少天气因素的干扰,不会因为施工作业而引起交通堵塞,保证了盾构过站施工的安全,从而为城市基础设施建设效果的提升奠定良好基础。本文主要对盾构机过地铁车站施工技术以及安全管理对策进行了分析,从而提高整体工程施工效率。With the acceleration of urbanization,the level of urban infrastructure is improving day by day,many cities have increased the construction of subway projects.The optimization and application of shield machine equipment in subway excavation operation can further improve the efficiency of subway station construction,reduce the interference of weather factors,will not cause traffic jams by construction operation,ensure the safety of shield construction,and lay a good foundation for the improvement of the effect of urban infrastructure construction.This paper mainly analyzes the construction technology and safety management countermeasures of the shield machine through the subway station,so as to improve the overall construction efficiency.

关 键 词:盾构机 过地铁站 施工技术 管理对策 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 