基于BIM技术的预制现浇结合式建筑马头墙施工技术  

CONSTRUCTION TECHNOLOGY OF PRECAST CAST-IN-PLACE COMBINED BUILDING HORSEHEAD WALL BASED ON BIM TECHNOLOGY

在线阅读下载全文

作  者:王翔 韩正虎[1] 袁帅[1] 施建焕 徐健 WANG Xiang;HAN Zheng-hu;YUAN Shuai;SHI Jian-huan;XU Jian(China Construction Second Engineering Bureau Ltd.,100160,Beijing,China)

机构地区:[1]中国建筑第二工程局有限公司,北京100160

出  处:《建筑技术》2024年第S2期88-91,共4页Architecture Technology

摘  要:为解决马头墙混凝土浇筑困难,施工周期长,马头墙底部错茬阶梯状模板的制作和搭设支撑困难,采用现浇混凝土成型要求高等技术问题。本文通过介绍基于BIM技术的预制现浇结合式建筑马头墙施工技术,本技术马头墙施工采用预制与现浇结合,具备可定量备料、错台部位施工便捷、马头墙受力良好、施工环境污染少等优势。In order to solve the technical problems that the construction of the horsehead wall is complicated and the masonry is difficult at the present stage,the support is difficult to be erected at the transition position between the bottom of the horsehead wall stack and the outer wall,and the cast-in-place concrete forming formwork is complex to support.This paper introduces the construction technology of precast and cast-in-place combined building horsehead wall based on BIM technology.This technology adopts the combination of precast and cast-in-place,which has the advantages of quantitative material preparation,convenient construction of staggered parts,good stress of horsehead wall and less pollution of construction environment.

关 键 词:BIM 预制现浇结合 马头墙 

分 类 号:TU74[建筑科学—建筑技术科学]

 