检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈亚 CHEN Ya(China Kaolin Clay Co.,Ltd.,Suzhou 215151,Jiangsu,China)
出 处:《工程技术研究》2025年第1期41-43,共3页Engineering and Technological Research
摘 要:高岭土矿是我国矿产资源中较为特殊的类型,由于大多数高岭土矿开采年限较为久远,因此面临着采矿效率低、劳动强度大等问题,现有的崩落法采矿存在一定的局限,应不断探寻从崩落法转向充填法的采矿工艺。文章以某高岭土矿为例,分析该矿山的基本现状,通过对比不同的充填采矿技术,选定了下向进路充填法采矿工艺,并将其应用到该矿山的后续开采中。实践结果表明,应用充填法采矿工艺不仅降低了采矿难度,还降低了劳动强度,提高了生产效率。Kaolin mine is a special type of mineral resources in China.Since most kaolin mines have been mined for a long time,they are faced with problems such as low mining effi ciency and high labor intensity.The existing caving mining method has certain limitations,and the mining technology transformation from caving method to fi lling method should be continuously explored.Taking a kaolin mine as an example,this paper analyzes the basic status of the mine,selects downward drift filling mining technology by comparing different fi lling mining technologies,and applies it to the subsequent mining of the mine.The practice results show that the application of filling mining technology not only reduces the mining diffi culty,but also reduces the labor intensity and improves the production effi ciency.
分 类 号:TD87[矿业工程—非金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.48.161