检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高盛 杨皖龙 GAO Sheng;YANG Wanlong(Anhui Surveyand Design Institute of Water Resources and Hydropower Co.,Ltd.,Hefei 230088,China)
机构地区:[1]安徽省水利水电勘测设计研究总院股份有限公司,合肥230088
出 处:《广东水利水电》2025年第2期51-54,65,共5页Guangdong Water Resources and Hydropower
摘 要:以横山咀渡槽工程为例,采用有限单元法对其抛物线拱圈进行计算分析,得出不同荷载组合作用下结构内力及变形位移。结果表明,横山咀渡槽拱圈结构内力分布符合规律,应力水平较低;各截面配筋符合规范要求,且安全裕度较大。研究成果可为同类型渡槽拱圈结构受力分析求解提供参考。Taking the Hengshanzui Aqueduct project as an example,the finite element method is used to calculate and analyze the parabolic arch ring,and the internal forces and deformation displacements of the structure under different load combinations are obtained.The results show that the internal force distribution of the arch ring structure of Hengshanzui Aqueduct conforms to the law,and the stress level is relatively low;The reinforcement of each section meets the requirements of the specifications and has a large safety margin.This method can provide reference for the stress analysis and solution of arch ring structures in the same type of aqueduct.
分 类 号:TV332.14[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7