工程项目进度管理与造价控制的协同机制探讨  

Research on the Collaborative Mechanism of Engineering Project Schedule Management and Cost Control

作  者:景羿乔 Jing Yiqiao(Housing and Urban Rural Development Bureau of Fenggang County,Zunyi 564200,China)

机构地区:[1]贵州省遵义市凤冈县住房和城乡建设局,贵州遵义564200

出  处:《工程造价管理》2025年第1期57-61,共5页Engineering Cost Management

摘  要:研究聚焦于工程项目中进度管理与造价控制的协同机制。文章通过实现一个实时信息共享平台,显著提高了项目的数据透明度和响应速度。同时,通过定期举办的风险管理工作坊,项目团队得以系统地识别和应对潜在风险,增强了项目的适应性和灵活性。案例分析揭示了这些策略在实际应用中的有效性,展示了如何通过协同管理实践减少项目延误和成本超支,有效提升了工程项目管理的整体效率和经济效益。This study focuses on the synergistic mechanism of schedule management and cost control in engineering projects.By implementing a real-time information sharing platform,the study significantly improved the data transparency and responsiveness of the project.At the same time,through regular risk management workshops,the project team was able to systematically identify and respond to potential risks,enhancing the adaptability and flexibility of the project.The case studies reveal the effectiveness of these strategies in practical applications,and show how collaborative management practices can reduce project delays and cost overruns,effectively improving the overall efficiency and economic benefits of engineering project management.

关 键 词:工程项目管理 进度管理 造价控制 协同机制 

分 类 号:F426[经济管理—产业经济] TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象