检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Zhenjiang BAI
出 处:《Meteorological and Environmental Research》2024年第6期56-59,共4页气象与环境研究(英文版)
摘 要:The large water transfer channels has a total length of more than 1000 km,spanning across the Huaihe River,the Yangtze River,the Yellow River and the Haihe River basins.During the preliminary design stage,the groundwater level was predicted based on the initial water level plus the groundwater level increase by precipitation infiltration and recharge in 1956 and 1996.However,after the rainfall in 2021 and 2023 to infiltrate and recharge groundwater,it is necessary to re-forecast the groundwater level.The Hebei section was taken as an example.Combined with the actual measurement of the historical maximum water level of the monitoring section and the inspection along the line,the water seepage of the canal slope was found.It is necessary to investigate the drainage system of the high groundwater level canal sections,take necessary treatment measures to improve the ability of the drainage system to cope with the rapid rise of high groundwater caused by heavy rainfall,and strengthen drainage measures for the risk parts of project safety in the high groundwater level canal sections,which are essential to ensure the safe operation of the middle route of the large water transfer channels.
关 键 词:Large water transfer channels High groundwater Pressure relief wells Design Construction
分 类 号:P64[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.79.94