检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李达 LI Da(China Railway Eryuan Engineering Group Co.Ltd.,Chengdu 610031,China)
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《工程建设与设计》2025年第3期98-100,共3页Construction & Design for Engineering
摘 要:盖梁在预应力作用下会影响曲线连续梁的结构受力,论文结合相关工程实例,通过有限元软件进行计算分析,结果表明,盖梁位置的主梁应力水平呈现曲线外侧低、内侧高的分布,相邻边支座其曲线内侧支反力小于曲线外侧,与曲线连续梁结构应力、支反力分布规律恰好相反。Cover beam under the action of prestress will affect the structure of the curve continuous beam,the paper combined with related engineering examples,through the finite element software calculation analysis,the results show that the position of the position of the main beam stress level outside curve low,inside high distribution,the inside of the adjacent edge support is less than the outside of the curve,and the curve continuous beam structure stress and reaction distribution pattern.
关 键 词:轨道交通 斜交隐式盖梁:小半径曲线 大跨度连续梁 结构设计
分 类 号:U448.215[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.118.216