检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:舒振 王岩 李鹏 Shu zhen;Wang yan;Li Peng(Beijing Triumph International Engineering Co,Ltd,Beijing 100024)
出 处:《水泥工程》2024年第6期42-45,共4页Cement Engineering
摘 要:某国外6500 t/d熟料水泥生产线原3.80m废气管道在烧成系统中连接高温风机与尾排风机收尘器,该管道走向不合理、拐角偏小,导致管道通风不畅、系统阻力大。文章介绍了此次高空大直径高温管道的改造范围、改造难点,详细分析了基于改造工期短,改造空间有限等条件下的改造方案选择。改造完成后,系统阻力降低了600 Pa,风机电耗降低1 kWh,熟料产量增加了150t/d,改造效果较好。The original 3.80m waste gas pipeline of a foreign 60500 t/d clinker cement production line was connected to a high-temperature fan and a dust collector of the exhaust fan in the burning system.The pipeline had an unreasonable direction and small corners,resulting in poor ventilation and high system resistance.The article introduces the scope and difficulties of the renovation of the highaltitude large-diameter high-temperature pipeline,and analyzes in detail the selection of renovation plans based on the short renovation period and limited renovation space.After the renovation,the system resistance decreased by 600 Pa,the fan power consumption decreased by 1 kWh,and the output of clinker increased by 150 t/d.The renovation effect was good.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7