检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡晓 HU Xiao(Guizhou Provincial Architectural Design&Research Institute Co.,Ltd.,Guiyang 550000,China)
机构地区:[1]贵州省建筑设计研究院有限责任公司,贵阳市550000
出 处:《建筑电气》2025年第1期56-60,共5页Building Electricity
摘 要:通过对贵州某数据中心传统配电与电力模块技术配电的系统架构、主要设备材料清单、平面布置设备空间占比、线缆成本、采购交付周期等方面进行分析,探讨传统配电与电力模块技术配电的差异,并分析电力模块技术在数据中心配电在工程造价、空间利用率、交付时间、安全可靠性、维护便利性等多方面的优势。This paper examines the system architecture,list of main equipment and materials,equipment space ratio in the floor plan,cable cost,procurement and delivery cycle,and other aspects of the traditional distribution and power module distribution systems adopted at a data center in Guizhou.It highlights the distinctions between the traditional and power module power distribution and examines the advantages of the latter in terms of project cost,space utilization,delivery time,safety and dependability,ease of maintenance,and other factors in power distribution of a data center.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249