检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈锦 Chen Jin(Shenzhen Joaboa Technology Co.,Ltd.,Wuhan Branch,Wuhan,Hubei430415,China)
机构地区:[1]深圳市卓宝科技股份有限公司武汉分公司,湖北武汉430415
出 处:《中国建筑防水》2025年第2期25-30,共6页China Building Waterproofing
摘 要:传统混凝土屋面防水层、保温层、找坡层和保护层等构造层次都是采用分层施工的方式进行的,施工过程中存在交叉作业相互影响的问题。本项目所采用的PVC型防水保温一体化板,是将PVC防水层和XPS保温层在工厂一次性热压复合成板,减少了屋面构造层次,简化了屋面施工工序;板材施工采用湿铺法,环境适应性强,施工效率高。本文详细介绍了该防水保温一体化板在武汉某产业园混凝土屋面上的具体应用,包括屋面施工工艺和防水节点处理方法。Traditional concrete roofing systems typically consist of multiple layers,including a waterproofing layer,insulation layer,slope-making layer and protective layer,which are constructed separately,leading to issues of cross-operation and mutual interference during the construction process.The PVC-type waterproofing and insulation integrated board used in this project is produced by hot-pressing a PVC waterproofing layer and an XPS insulation layer together in the factory,reducing the number of roofing layers and simplifying the roofing construction process.The board is installed using a wet-laid method,which has strong environmental adaptability and high construction efficiency.This article details the specific application of this waterproofing and insulation integrated board on the concrete roof of an industrial park in Wuhan,including the roofing construction process and waterproofing detail treatment methods.
关 键 词:混凝土屋面工程 防水施工 PVC型防水保温一体化板 湿铺法
分 类 号:TU761.11[建筑科学—建筑技术科学] TU231
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.13.48