检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张柏会 ZHANG Baihui(Gansu Institute of Urban Planning and Design Co.,Ltd.,Lanzhou 730000,Gansu,China)
机构地区:[1]甘肃省城乡规划设计研究院有限公司,甘肃兰州730000
出 处:《资源信息与工程》2025年第1期25-27,共3页Resource Information and Engineering
摘 要:针对江西省德兴市龙头山乡某隧道工程,在区内开展了以1∶2000工程地质测绘、钻探、物探、室内试验等技术方法为主的工程勘察工作,综合前人研究进行工程地质与环境地质评价,基本查明了拟建隧道区域工程地质及水文地质特征。将拟建隧道计算划分为总长1000 m隧道,其中Ⅴ级围岩长度770 m、Ⅳ级围岩长度230 m。隧道弃渣及隧道施工对环境存在一定影响,需注意施工方法并做好保护措施。For a tunnel project in Longtoushan Township,Dexing City,Jiangxi Province,engineering investigation work mainly based on 1∶2000 engineering geological mapping,drilling,physical exploration,indoor testing and other technical methods was carried out in the area.The engineering geology and environmental geology evaluations conducted by comprehensive the previous research have basically identified the engineering geology and hydrogeology characteristics of the proposed tunnel area.The calculation of the proposed tunnel is divided into a total length of 1000 m tunnel,of which the length of Class V perimeter rock is 770 m andⅣperimeter rock is 230 m.Tunnel slag disposal and tunnel construction have an impact on the environment,which requires attention to the construction methods and protection measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7