检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卿太平 姚俊 QING Taiping;YAO Jun(th Nuclear Geological Brigade of Guangxi Zhuang Autonomous Region,Liuzhou 545005,Guangxi,China)
机构地区:[1]广西壮族自治区三〇五核地质大队,广西柳州545005
出 处:《资源信息与工程》2025年第1期40-43,共4页Resource Information and Engineering
摘 要:人类工程活动和降水作用是多数滑坡变形破坏的主要影响因素。本文以广西环江县某滑坡为例,分析人工切坡和降水耦合作用下斜坡变形破坏的机理。研究结果表明:在人工切坡和降水耦合作用下,斜坡最开始变形破坏部位往往是人工切坡的坡脚,变形破坏呈现间歇性,变形破坏的周期和程度与降水强度和持续时间正相关。Human engineering activities and precipitation are the main factors of deformation and damage of most landslides.This paper takes a landslide in Huanjiang County as an example to analyze the mechanism of slope deformation and damage under the coupling effect of artificial cutting slope and precipitation.The results show that under the coupling effect of artificial cutting slope and precipitation,the initial deformation and damage part of the slope is often the foot of the artificial cutting slope,and the deformation and damage are intermittent,and the period and degree of deformation and damage are positively correlated with the intensity and duration of precipitation.
分 类 号:P642.2[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91