检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵新增[1] ZHAO Xinzeng(Safety Management Department of Dongqu Coal Mine of Shanxi Coking Coal Group Co.,Ltd.,Taiyuan 030200,Shanxi,China)
机构地区:[1]山西焦煤集团有限责任公司东曲煤矿安全管理部,山西太原030200
出 处:《凿岩机械气动工具》2025年第2期127-129,共3页Rock Drilling Machinery & Pneumatic Tools
摘 要:为分析大采高工作面中厚硬顶板对煤壁稳定性的影响,文章通过模型构建和理论分析,研究了厚硬顶板及煤壁的特性、相互影响及力学性质。采用控制变量法、顶板预裂技术等,分析了基本顶破断步距和厚度对煤壁稳定性的影响。结果表明,厚硬顶板易导致强烈矿压,增加煤壁片帮风险,但通过进行合理的顶板预裂处理,能有效控制煤壁位移,增强稳定性。In order to analyze the influence of thick and hard roof plate on the stability of coal wall in high mining face,this paper studies the characteristics,mutual influence and mechanical properties of thick and hard roof plate and coal wall through model construction and theoretical analysis.The influence of the breaking step and thickness of the main roof on the stability of the coal wall is analyzed by using the control variates and the roof plate pre-splitting technology.The results show that the thick and hard roof plate is easy to lead to strong mine pressure and increase the risk of coal wall piece spalling.However,through reasonable roof plate pre-splitting treatment,the displacement of coal wall can be effectively controlled and the stability can be enhanced.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.25.32