检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘鹏[1] 刘守浩 张俊钢 李猛 黄坤[1] 孟志强[1] 杨瑞鹏 Liu Peng;Liu Shouhao;Zhang Jungang;Li Meng;Huang Kun;Meng Zhiqiang;Yang Ruipeng(Construction Company of Anyang Iron and Steel Group Co.,Ltd.,Anyang 455004,Henan,China)
机构地区:[1]安阳钢铁集团有限责任公司建设公司,河南安阳455004
出 处:《冶金设备管理与维修》2025年第1期7-9,共3页Metallurgical Equipment Management and Maintenance
摘 要:针对高炉检修时粒化塔耐磨材料无法短时间更换,导致粒化塔更换耐磨材料时需要过长时间休风,造成较大经济损失,因此,提出了利用提前制造出耐磨块的方法来解决粒化塔无法在高炉短时间检修内更换耐磨材料的问题,该方法节约了大量人力资源、材料成本,避免了因高炉更换耐磨材料休风所造成的损失。In view of the inability to replace wear-resistant materials in the granulating tower in a short period of time during blast furnace maintenance,which leads to the fact that the wear-resistant materials of granulating tower need to damp down for a long time resulting in significant economic losses,a method of manufacturing wear-resistant blocks in advance is proposed to solve the problem of the granulating tower being unable to replace wear-resistant materials in a short period of time during blast furnace maintenance.This method saves a lot of human resources and material costs,and avoids losses caused by damping down due to the replacement of wear-resistant materials in the blast furnace.
分 类 号:TH122[机械工程—机械设计及理论] TF576.7[冶金工程—钢铁冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49