检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘宇 LIU Yu(China Railway 22nd Bureau Group Fourth Engineering Co.,Ltd.,Tianjin 301700,China)
机构地区:[1]中铁二十二局集团第四工程有限公司,天津301700
出 处:《价值工程》2025年第6期166-168,共3页Value Engineering
摘 要:本文研究了铁路工程中有砟轨道施工铺轨技术,通过深入探讨道砟摊铺、道岔铺设、轨排铺设及长钢轨铺设与焊接等关键技术环节,系统分析了技术流程与质量控制措施。采用现场实践与理论分析相结合的方法,提出了提高施工精度与效率的策略。研究结果表明,合理控制摊铺厚度、压实度及焊接质量等关键因素,能显著提升轨道的稳定性和平顺性。这一成果对确保铁路工程质量和运营安全具有重要意义,为铁路建设提供了科学依据和技术指导。This article studies the construction and laying technology of ballasted tracks in railway engineering.Through in-depth exploration of key technical links such as ballast laying,turnout laying,track panel laying,and long steel rail laying and welding,the technical process and quality control measures are systematically analyzed.A strategy for improving construction accuracy and efficiency was proposed by combining on-site practice with theoretical analysis.The research results indicate that reasonable control of key factors such as paving thickness,compaction degree,and welding quality can significantly improve the stability and smoothness of the track.This achievement is of great significance in ensuring the quality and operational safety of railway engineering,providing scientific basis and technical guidance for railway construction.
分 类 号:U215.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26