检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张威 Zhang Wei
机构地区:[1]湖北省交通规划设计院股份有限公司
出 处:《交通与港航》2025年第1期66-70,共5页Communication & Shipping
摘 要:针对某墩式重件码头桥机轨道梁采用钢悬臂梁结构时因桥机荷载大而引起悬臂结构强度要求高、刚度要求大和挠度控制难等一系列问题,结合桥梁技术,提出了新颖的钢架式悬臂梁结构并通过有限元分析验证其可靠性,结果表明钢架式悬臂梁结构综合了斜拉杆式和桁架梁式结构的优点,解决了桥机轨道梁钢结构轻量化问题的同时加大了悬臂梁有效长度,提高了轨道梁的承载能力和横向约束,降低了施工难度,在码头和桥梁技术融合上具有借鉴意义。In view of a series of problems,such as high strength requirement,high stiffness requirement and difficult deflection control of the cantilever structure caused by the steel cantilever beam structure used in the rail beam of a pier-type heavy-duty quay bridge crane,combined with bridge technology,a novel steel frame type cantilever beam structure is put forward.It combines the advantages of cable-stayed and truss beam,effectively increases the length of the cantilever beam,realizes the lightweight of the bridge crane rail beam steel structure,improves the bearing capacity and lateral restraint of the track beam,reduces the construction difficulty,and through the finite element analysis,the reliability of the steel-framed boom structure is verified,which can be used for reference in the fusion of wharf and bridge technology.
分 类 号:U653.921[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7