检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石明 杨郭凌子 SHI Ming;YANG Guolingzi(Shanghai Investigation,Design&Research Institute Co.,Ltd.,Shanghai 200335,China)
机构地区:[1]上海勘测设计研究院有限公司,上海200335
出 处:《水电与新能源》2025年第2期8-12,共5页Hydropower and New Energy
摘 要:随着海上风电场容量不断扩大,风电汇集与送出方案的优化成为大规模海上风电项目关注重点。以某百万千瓦海上风电场为例,根据场内风机间连接方式和海上升压站位置的不同,提出了四套集电线路及海上升压站设计方案,然后从技术和经济性两方面进行综合比选,从而获得最优方案。With the continuous expansion of the capacities of offshore wind farms,optimization of the power collection and transmission schemes has become a key issue in large-scale offshore wind power projects.Taking a million-kw level offshore wind farm as an example,four different design schemes of the collection lines and the offshore booster station are proposed according to the collection methods between the wind turbines and the location of the offshore booster station.Then,a comprehensive comparison is carried out from both technical and economic aspects to obtain the optimal scheme.
关 键 词:海上风电场 集电线路 海上升压站 技术经济性评价
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171