乌东德水电站机组不同运行方式发电效率分析  

On the Power Generation Efficiency of Hydroelectric Units in Wudongde Hydropower Station under Different Operation Modes

作  者:费国森 吕成 刘邓 张岚彬 FEI Guosen;LV Cheng;LIU Deng;ZHANG Lanbin(China Yangtze Power Co.,Ltd.,Kunming 650000,China)

机构地区:[1]中国长江电力股份有限公司,云南昆明650000

出  处:《水电与新能源》2025年第2期52-55,共4页Hydropower and New Energy

摘  要:机组运行方式直接关系到电站发电效益。以乌东德左岸电站为研究对象,通过比较在同一水头、同一负荷下,不同开机台数运行方式时,机组过流量的大小,从而找出最优的开机运行方式。研究发现,在同一负荷下,开机台数越少,机组的过流量越低,水头也将随之增高,从而降低耗水率,提高发电效率,达到增发电量的目的。The operation mode of hydroelectric units directly affect the power generation efficiency of hydropower stations.Taking the left bank power plant in Wudongde Hydropower Station as an example,the optimal operation mode of the units is determined by comparing the flow of the units under different number of operated units while with the same water head and load.It found that under the same load,the fewer the number of operated units,the lower the flow,and the higher the water head.Thereby,the water consumption rate is reduced and the power generation efficiency is improved.Thus,the goal of increasing the electricity generation is achieved.

关 键 词:乌东德水电站 水电机组 运行方式 发电效率 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象