检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林锦坤 何桂花 LIN Jinkun;HE Guihua(Guangdong Power Grid Limited Liability Company Shanwei Power Supply Bureau,Shanwei 516600,China)
机构地区:[1]广东电网有限责任公司汕尾供电局,广东汕尾516600
出 处:《造纸科学与技术》2025年第1期21-24,共4页Paper Science And Technology
摘 要:现浇型的配电线路加强型水泥杆地基通常都需要经过长时间的固化养护,有时难以保证工程施工进度。为提升配电线路加强型水泥杆地基工程施工效率和施工效果,以剑麻纤维为原材料制备了一种预制式的高韧纤维混凝土并对该混凝土的综合性能进行了试验分析。结果表明,当剑麻纤维掺量为0.4%时,可以保证在较短的养护时间内便达到最为理想的综合力学效果,但混凝土试样的养护时间越长则配电线路加强型水泥杆预制地基的综合性能仍越强。The reinforced cement pole foundation of cast-in-place distribution lines usually needs to be cured for a long time,and sometimes it is difficult to ensure the construction progress.In order to improve the construction efficiency and effect of reinforced cement pole foundation for power distribution lines,a prefabricated high-toughness fiber concrete was prepared with sisal fiber as raw material and its comprehensive performance was tested and analyzed.The results show that when the content of sisal fiber is 0.4%,the best comprehensive mechanical effect can be achieved in a short curing time,but the longer the curing time of concrete samples,the stronger the comprehensive performance of reinforced cement pole precast foundation.
分 类 号:TS72[轻工技术与工程—制浆造纸工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.184.99