检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:丁强强 DING Qiangqiang(Bayingolin Hydrological Survey Center,Korla,841000,China)
机构地区:[1]巴音郭楞水文勘测中心,新疆库尔勒841000
出 处:《河南水利与南水北调》2024年第12期31-32,35,共3页Henan Water Resources & South-to-North Water Diversion
摘 要:乌拉斯台洪水主要由黄水沟西支与乌拉斯台河老河道洪水组成,并受多处防洪闸调洪影响。为了计算乌拉斯台河堤防工程设计洪水,基于堤防工程概况和洪水组成及水文资料,在分析黄水沟西支汇入洪水的基础上,采用实测资料长短系列法、水文比拟法,对乌拉斯台河堤防工程处的设计洪峰流量进行了探讨,提出乌拉斯台河防洪工程处50年一遇设计洪峰流量为189 m^(3)/s,为复杂工况下的设计洪水研究提供了借鉴。The flood of Ulastai River mainly consists of the flood of west branch of the Huangshui Ditch and the old channel of Ulastai River,and is regulated by many flood control sluices.In order to calculate the design flood of the Wulastai River levee engineering,based on the general situation of the levee engineering,the flood composition and hydrological data,and the analysis of the flood from the west branch of the Huangshui Ditch,the design flood peak of the Wulastai River levee engineering is discussed with the measured data length series method and hydrological analogical method.It is proposed the design flood peak of the Wulastai River flood control works is 189 m^(3)/s once in 50 years,which provides a reference for the study of the design flood under complex conditions.
分 类 号:TV123[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249