检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李婷 LI Ting(Gansu Jiantou Water Resources and Hydropower Co.,Ltd.Lanzhou 730070,China)
机构地区:[1]甘肃建投水利水电有限公司,甘肃兰州730070
出 处:《全面腐蚀控制》2025年第2期137-139,143,共4页Total Corrosion Control
摘 要:为解决水库淤积对水资源调节和供水能力的影响,本文以某县水库综合利用工程为例,通过清淤治理恢复水库的调节库容,优化其功能,从而实现向某县县城及该县三个乡镇提供综合生活调节供水的目标。该工程的建设内容主要包括引水工程改造施工、水库枢纽改造及库区治理施工以及新建供水工程施工,因此,本文重点探究了这些方面的施工方法,以期为相关人员提供参考。In order to address the impact of reservoir sedimentation on water resource regulation and water supply capacity,this article takes the comprehensive utilization project of a certain county’s reservoir as an example,restores the regulating storage capacity of the reservoir through dredging treatment,optimizes its function,and thus achieves the goal of providing comprehensive living regulation water supply to the county seat and three townships of the county.The construction content of this project mainly includes the renovation of the water diversion project,the renovation of the reservoir hub and the management of the reservoir area,and the construction of new water supply projects.Therefore,this article focuses on exploring the construction methods in these aspects,in order to provide reference for relevant personnel.
分 类 号:TV697.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.150.3