检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈炳耀 何少阳 CHEN Bing-yao;HE Shao-yang(Guangdong Bay Area Transportation Construction Investment Co.,Ltd,Guangzhou 51oooo,China;CCCCHighway Consultants Co.Ltd.,Beijing 100010,China)
机构地区:[1]广东湾区交通建设投资有限公司,广州市510000 [2]中交公路规划设计院有限公司,北京市100010
出 处:《公路》2025年第2期148-153,共6页Highway
摘 要:针对某钢混组合连续梁桥顶推施工,分析了使用的监控技术方法,确定了主梁线形及应力监控测点布置方式,明确了桥梁顶推施工监控要点。施工监控结果表明,该桥各项指标的监测值与设计要求吻合,主梁线形及应力状态均控制在合理范围内。Taking a steel-concrete composite continuous beam bridge as the background,in this paper the monitoring technology and methods used in the incremental construction process of the steel-concrete composite continuous beam bridge are analyzed,the main beam alignment and stress monitoring measurement point and layout are determined,and the key points of bridge incremental construction monitoring are defined.The construction monitoring results show that the various monitoring indicators of the bridge are consistent with the design requirements,and the main beam geometry and stress state are controlled within a reasonable range.
关 键 词:桥梁工程 钢混组合梁桥 顶推施工 主梁线形控制 主梁应力监控 施工过程监控
分 类 号:U445.462[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7