检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:桑增伟 SANG Zengwei(Henan Branch of China South-to-North Water Diversion Group Middle Route Co.,Ltd.,Zhengzhou 450000,China)
机构地区:[1]中国南水北调集团中线有限公司河南分公司,郑州450000
出 处:《南水北调与水利科技(中英文)》2024年第S2期115-121,共7页South-to-North Water Transfers and Water Science & Technology
摘 要:南水北调中线干线工程是全线无调蓄线性工程,采取节制闸梯级控制统一调度模式,目前节制闸多采用液压启闭机控制闸门开度,现有的液压启闭机养护调度方案,采取闸门逐孔全关,多孔闸门同步操作的策略,调度配合过程中容易引起闸前水位和过闸流量突变,不利于正常输水调度。为研究液压启闭机养护过程,并优化调度方案,根据中线工程丈八沟节制闸液压启闭机养护过程调度配合经验,对现有调度方案进行分析,针对3项问题分别提出优化调度策略。通过采取区分工况、调整闸门操作次序、异常数据屏蔽的方式,达到拓宽使用限制条件、保持过流稳定、降低水位波动、减少数据干扰的目标。分析成果对于保证南水北调中线的工程安全和供水安全具有重要意义。The Middle Route of South-to-North Water Transfers Project is a linear project without regulation and storage along the entire line.It adopts a unified scheduling mode of cascade control of regulating gates.Currently,the regulating gates are mostly controlled by hydraulic opening and closing machines to control the gate opening.The existing maintenance and scheduling plan for hydraulic opening and closing machines adopts the strategy of fully closing each gate hole and synchronously operating multiple gates.During the scheduling coordination process,it is easy to cause sudden changes in the water level and flow rate in front of the gate,which is not conducive to normal water transmission scheduling.To study the maintenance process of hydraulic opening and closing machines and optimize the scheduling plan,based on the experience of coordinating the maintenance process of hydraulic opening and closing machines for the Zhangbagou control gate in the central line project,the existing scheduling plan was analyzed,and optimization scheduling strategies were proposed for three issues.By adopting methods such as distinguishing operating conditions,adjusting gate operation sequence,and shielding abnormal data,the goal of expanding usage restrictions,maintaining overcurrent stability,reducing water level fluctuations,and minimizing data interference can be achieved.The analysis results are of great significance for ensuring the safety of the Middle Route of South-to-North Water Transfers Project and water supply safety.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63